Design Review Schedules 2023 - 2024
Academic Year Long ProjectsÌý Spring Semester Only ProjectsÌý
CoDR:ÌýOctÌý23 - 27, 2023 CoDR:ÌýN/A
PDR:ÌýFeb 5 - 9, 2024 PDR: Feb 5 - 9, 2024
CDR:Ìý March 4 - 8, 2024 CDR: March 4 - 8, 2024
FPR:Ìý April 8 - 12, 2024 FPR: April 8 - 12, 2024

Design Review Templates:ÌýYou are required to use these templates for each review. More details about each review below

CoDR Template (full year project only)

PDR Template

CDR Template

FPR Free Form

Conceptual Design Review (CoDR):ÌýThe purpose of this review is to meet your team and for you to demonstrate that you have a plan moving forward in the program. Do you understand the objective? Can you define minimum success? Show an understanding and requirements of your wearable at the "block" level. Presenting the pros and cons, feasibility, and conformity to the mission requirements will constitute a successful CoDR.

Preliminary Design Review (PDR):ÌýThe second of three major design reviews. The time between CoDR and PDR should be used to start initial research and further feasibility studies on the architectures presented at CoDR. By PDR, you should be able to justify the architechture that will solve the design problem. It is essential that after PDR there is a clear understanding of the final system architecture as well as its feasibility. Additionally, it should be clearly demonstrated that all project and system level requirements can be met by this architecture. Be sure that you leave "off-ramps" in your design in case the scope ends up being larger than what can be accomplished in the time frame allotted. Ìý

Critical Design Review (CDR):ÌýÌýThe time between PDR and CDR should be used to finalize the design of your wearable. CDR marks the point in a design where all major components have been decided on. By CDR, all schematics are complete, all wiring diagrams are complete, most mechanical drawings are complete, mechanical assemblies have been completed, software flow is fully defined, all other subsystems are clearly defined and meet their design to specifications, andÌýplans are in place for the manufacturing and testing of the project. Key results of final analysis and prototyping should also bring confidence to areas of high risk presented at PDR. New risks (and potential mitigation) should also be presented.ÌýReviewers should walk away from a CDR feeling comfortable that the project will succeed.ÌýÌýÌýÌý

Final Project Review (FPR):ÌýÌýThis is a Wearables Quest specific review.ÌýIt provides the team structure to begin closing out the project as they begin plans/actions to create the required WQ video submission.

Good Luck! Questions can be emailed directly to Verónica Corral atÌývcorral@colorado.edu